The current process (as-is) describes how work is done today, with its steps, actors and problems. The target process (to-be) describes the intended way of working after the change. The gap between the two guides the requirements and the actions to take.
Example
As-is: manual entry in a spreadsheet. To-be: single entry in the tool, automatic check.